Week 6, Shower Door and Paint

Week 6, Shower Door and Paint

It is Week 6 for the One Room Challenge and I'm at the point in the project when I start to stress about every little thing. This could possibly be the first challenge that I finish on time! 

This week the shower door was installed. It came out great. Since the shower is only 30" wide, we had the door mounted closer to the outside instead of central on the saddle. This helps to maximize the space in the shower just a little bit. Since the majority of the metal in the bathroom is polished nickel, including the shower plumbing, we did polished nickel on the shower door hardware. 

The console sink arrived, but I am just waiting for some of the trim pieces. The only thing left is the wallpaper and lighting-a major detail. I am hoping to get it done on time!

I finally picked the paint color-and I think it will be awesome!

Check back next week-I should have big changes by then! And as always, check out the other contestants here.

 